Tickets now on sale

Xtreme Stone Protect 3-in-1

GftK vdw 950

The PHNA Xtreme Stone Protect 3-in-1 is a ready-to-use, water-based impregnation for the hydrophobic (water-repelling) and oleophobic (oil-repelling) treatment of natural stone and other porous paving units.

GFTK VDW 950 Gravel Epoxy
A Backyard Patio And Rock Garden Hardscape Installation In PA
Smuckers Hardsacping Hardscape Project In New Holland PA 3

Why Use Xtreme Stone Protect 3-in-1 ?

GFTK Xtreme Stone Protect 3-in-1 is like a special liquid that you can easily use to protect natural stone and similar types of paving from water and oil. It can also be used before using VDW jointing compounds to make sure there’s no leftover stuff on delicate paving.

water based formula vdw 950

Water-Based Formula

 This Xtreme Protect allows for the same strength needed without the off-gassing that can occur with other products. It does not contain harmful chemicals, solvents, or VOCs that can harm the environment or pose a health risk to anyone exposed.

invisible vdw 950

Invisible

This allows you to be worry-free about your project, knowing it’s covered and sealed while allowing you to appreciate all the hard work put into its installation. This keeps the stone looking as natural as possible while offering maximum protection!

water repellent vdw 950

Water and oil-repellent

Being water and oil repellent allows for maximum protection while including ease and accessibility in cleaning any spills that may occur. Hydrophobic (water-repelling) and oleophobic (oil-repelling) allow homeowners peace of mind living in any climate or any installation when using natural stone.

natural stone vdw 950

For Natural Stone and Concrete Pavers

This treatment is an environmentally friendly choice for tile installations. It is made with eco-friendly materials that reduce its impact on the environment. Its water-based formula allows it to penetrate deep into the stone and protect it from the inside out! Especially for sensitive pavers.

GFTK VDW 950 Gravel Epoxy

Technical Product Data

Product SizeComes in a jug and small bottle
Application Time10-26°C | 50-80°F (Ambient and surface temp.)
Open to Pedestrian Traffic70 – 85 ft depending on stone type and application method
Full EffectAfter 24 hours at 20°C | 68°F and 65% rel. humidity
DurationApprox. 2 years (dependent on the surface type, level of product absorption, and exposure)
DensityApprox. 1.0 g/l
pH Value Approx. 5
ConsumptionApprox. 50 – 100 sq. ft. per liter | 250 – 500 sq. ft. per unit (Highly dependent on the absorbency of the substrate, and in case of doubt, should be determined by applying a test area first
Storage Life1 year if stored unopened in sealed and undamaged packaging. Must also be kept dry, cool and frost-free.

Application Instructions for Xtreme Stone Protect 3-In-1 VDW 950

1

Construction Site Requirements

  • A clean and dust-free, structurally sound, absorbent and dry paved surface which is otherwise ready for jointing; or with jointing that is fully cured and has no residual resin binder on the surface.
  • Ambient and surface temperatures minimum 10 ° C / 50 °F, maximum 26 °C / 80 °F, with dry weather conditions and no rain or heavy dew forecast for at least 24 hours.

2

tools

Low pressure sprayer, brushes, or rollers; sponges to remove any excess.

3

Application

  • The areas to be treated should be completely dry, clean and free from any dirt or contaminants that could prevent or reduce penetration.
  • Apply the Xtreme Stone Protect 3-in-1 with a suitable low pressure sprayer, brush, or roller evenly over the surface to saturation, but avoiding any residual ponding or puddling.
  • Remove any excess with a sponge; this is particularly important on surfaces with uneven absorbency, otherwise localized darkening can occur.
  • Avoid splashes on adjacent materials and remove any spillages immediately with a damp cloth. Suitable PPE should be used, including goggles and gloves etc.

4

Curing

  • Protect area‘s treated with the Xtreme Stone Protect 3-in-1 from moisture and any other dirt or surface contamination for a minimum of 5 hours before access, 24 hours before use (at 20 °C / 68 °F and 65 % relative humidity).
  • When completely dry, the treated paving can also be pointed with the appropriate PHNA jointing compound, if this was not completed before the treatment.

Shop more GftK Jointing Products